Full-time

Cost Controller

Posted by Dodin Québec • Pickering, ON, Canada

📍 Pickering, ON 🕒 March 01, 2026

About the Role

Dodin Québec , a subsidiary of VINCI Construction Grands Projets in Canada is looking for a

Cost Controller

Overview

The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep-water intake in Lake Ontario to improve the plant's cooling system. This will involve:

  • A 5 km-long tunnel, built by a pressurized TBM (10.15 m diameter slurry TBM);
  • Two vertical shafts (onshore and offshore);
  • An offshore modular intake structure, resting on the lake bed.

The project is distinguished by its proximity to an active nuclear site, requiring rigorous standards of safety, planning and coordination.

What you will do

The Cost Controller is responsible for reporting on the cost budget and preparing accurate forecasts to compare with the projected budget. They will investigate variances and discrepancies and seek to correct them in collaboration with ...

Ready to Apply?

Submit your application today and take the next step in your career journey with Dodin Québec.

Apply Now