About the Role
Job Description
Insight Global is seeking a Construction Scheduler to support a large, utility scale renewable energy EPC organization. This is a fully remote role supporting multiple large scale projects across the U.S.
Responsibilities include:
• Support multiple project teams across the full construction lifecycle, including preconstruction, active construction, and project closeout
• Develop, maintain, and update Level 3 / Level 4 schedules for large scale EPC renewable energy projects (typically $50M–$100M+, utility scale preferred)
• Use Oracle Primavera P6 to create baseline schedules, manage logic, track progress, perform updates, and analyze impacts
• Manage detailed schedules with 5,000+ activities, ensuring accurate sequencing and logic
• Eventually, perform resource loading and support schedule driven forecasting
• Identify schedule risks, delays, and constraints, and propose mitigation strategies
• Collaborate cross functionally with engine...
Insight Global is seeking a Construction Scheduler to support a large, utility scale renewable energy EPC organization. This is a fully remote role supporting multiple large scale projects across the U.S.
Responsibilities include:
• Support multiple project teams across the full construction lifecycle, including preconstruction, active construction, and project closeout
• Develop, maintain, and update Level 3 / Level 4 schedules for large scale EPC renewable energy projects (typically $50M–$100M+, utility scale preferred)
• Use Oracle Primavera P6 to create baseline schedules, manage logic, track progress, perform updates, and analyze impacts
• Manage detailed schedules with 5,000+ activities, ensuring accurate sequencing and logic
• Eventually, perform resource loading and support schedule driven forecasting
• Identify schedule risks, delays, and constraints, and propose mitigation strategies
• Collaborate cross functionally with engine...
Ready to Apply?
Submit your application today and take the next step in your career journey with Insight Global.
Apply Now